Belene NPP
On 8 April 2005 the Government made a decision for construction of a new nuclear power generating capacity in Bulgaria.
The decision specifies that the nuclear power plant shall have a maximum total capacity of 2000 MW electrical power generated by pressurised water reactors.
The decision is made on the basis of:
* Technical and economic analysis (feasibility assessment);
* Approved environmental impact assessment report;
* Public hearing series held in the period 2002 – 2004.
More information about Belene NPP Project (download video in avi format):
- Belene NPP Site Layout (98.2MB)
- Process Diagram (33.6MB)
- Reactor Installation (26.8MB)
- Steam Turbine Installation (150MB)
- Safety Systems (93.1MB)
- Safety Assessment in Case of Flooding at Belene NPP Site (94.3MB)
Final Report on the Additional Safety Assessment "Stress-Tests" for Belene NPP (3.70MB) ![]()

